Real results

Company names withheld where required — the numbers are real.

B2C SaaS

stackworth.app

Project

A B2C SaaS platform for gold and silver stackers, built and shipped end-to-end as a live PWA.

Model

Stripe-powered subscription billing. Post-revenue, with growth driven through influencer marketing rather than paid ads.

Visit stackworth.app →
Manufacturing

$4M/yr manufacturer

20+
Custom systems built & integrated
Problem

Production, inventory, and fulfillment were run on pen and paper — no shared visibility, no way to scale.

Solution

Built and integrated 20+ custom systems (Airtable + Make) covering production, inventory, tooling, maintenance, QC, and CRM, plus a full SAP migration from multi-tenant to single-tenant architecture and a Power BI reporting pipeline.

Impact

The entire operation went from paper-based to fully connected and digitally visible, end to end.

Telecom / ISP

$180M+ ISP

$2M+
Saved per year
Problem

Capacity purchasing from cable carriers and ILECs relied on inaccurate demand estimates, driving overspend.

Solution

Built an accurate demand-forecasting model, plus financial models directing ~$500K/month in digital marketing spend and seasonality-adjusted performance tracking.

Impact

~$2M/year in capacity-purchasing savings while holding the same service level.

Construction (PE-Backed)

$700M/yr US construction company

$75,000
Saved per year, from one automation alone
Problem

The accounting department was buried in manual, repetitive work across disconnected systems, with no automation in place.

Solution

Enterprise system integration using Workato automation and Sage Intacct configuration — starting with one accounting automation that alone eliminated over 1,000 hours of manual work per year (at ~$75/hour, that's $75,000/year), then extending to 10+ additional automations of varying sizes across the department.

Impact

$75,000/year saved from a single automation — with 10+ more solutions layering on additional savings across the department.

Food & Beverage Manufacturing

PepsiCo — "Waste Atlas"

8
Production lines mapped, in one month
Problem

No plant-wide, line-by-line view of production waste to act on.

Solution

Built a reusable, interactive waste map across 8 production lines during a one-month placement.

Impact

Sparked a company-wide cost-saving pipeline and earned a top-2 regional summer-intern award.

Want results like these?

Book a free growth call — we'll find your bottleneck and show you exactly what we'd build.